Zion National Park, Utah
Temple of Sinawava Dam Removal and Waterline Replacement
Client
National Park ServiceProject Description
Wu & Associates served as the general contractor to reconfigure the Temple of Sinawava Dam within a short time frame in order to avoid interference with the fish spawning season. Work included the installation and connection of an under river waterline and utilities pipe conduit, removal and disposal of existing concrete, regrading of the North Fork Virgin River, installation of boulder embankment rip rap, and construction of grade control rockweirs.